SD - Surya - Damodhier - 2017-09-17 - 53755 - Spec - ASN for Liverpool (Rizwan by 2017-10-20) #wipdev #ShippingNotification #Shipping #Mexico

SPECIFICATIONS

53755 - Spec - ASN for Liverpool


Purpose


ASN for Liverpool.

Admin Info


Purpose
ASN for Liverpool
Requested By
Rizwan Shah
Spec Created By
Surya Basa
Spec Created Date
10-05-2017
Spec QA by
Surya Basa
Objects

Document Status
WIP


Estimates



Sl.No
Activity
Estimation in Hours
1
Research
08
2
Documentation
08
3
Development/ Config
40
4
Unit test in DEV
40
5
Unit test in QUA

6
Other activity


TOTAL
96

References


Prior Tickets

[Provide links of prior associated Spec / Break Fix BOSS document(s)]

NA


Documents

[Attach any document(s) received for the requirement(s)]

Specs ASN Liverpool 23692910.xls

23692910.xlsx

23692910 ASN Example.txt

ASN LIVERPOOL English.pptx

Spec Changes


[List the changes made to program after the approval of the original requirement along with the Date on which the change request was received and the name of the initiator]

Sl.
Change Details
Requested By
Requested On
Notes if any
1
1. Space is provided between RFC and PO number.
2.Distribution Centre number (17 row) should be from Ship to Cust ID .
3.Store Number (20 row) should be from JM partner Cust ID .
4. If packing is not done for the delivery then the ZLSN output would be errored in the proforma invoice.
Rizwan Shah
01/17/2018
N/A
2
Add Cust Dept from SO item to the ASN file
Rizwan Shah
02/14/2018
N/A















Functional Requirement


Purpose/WHY:

[Explain the purpose of the project and the reason why this requirement has come]

We need to design the ASN for Liverpool it looks like is close it to the Innova structure, but in Liverpool's case Menlo needs to be able to add the RFID on every cardboard box, this need to be added from SAP so we can register which RFID is assign to every package.

In Scope:

[List the activities to be included in scope]


Out of Scope:

[Out of scope activities]


Solution Summary


[Discuss this section with Requester and get approval prior to beginning work]

Config

1. Create a new output, alternatively use existing for Liverpool to generate the ASN flat file

ABAP

1. A new ASN form should be developed, alternatively use an existing form and code suitably for Liverpool to accommodate the changes.


Test Plan

[List test scenarios/cases to be executed here]

Tests as mentioned in the spec
Test ID
Test Scenario


SD-001
Create single So and single delivery.Create single proforma
SD-002
Create Single SO and multiple delivery.Create single proforma
SD-003
Create multiple SO's and single delivery.Create single proforma
SD-004
Create multiple SO's and multiple deliveries.Create single proforma.

Solution Details


[Provide complete technical details for configuration or programming here]

1. New output ZLSN is created for V3 application with 0004 access sequence and medium as 8 (special function).
2. Assign the program and routine to the output as below.
3. The ZLSN output is assigned to the output determination procedure.

Issues


[List Issues / Bugs identified in configuration or development]